Project Prefabrication

Using BIM technology, two-dimensional drawings and plans are simulated in three-dimensional or animated form to simulate the entire construction process or key processes to verify the feasibility of the construction plan, so as to understand the construction and formulate the best construction plan, thereby strengthening the feasibility controlled management to improve project quality and ensure construction safety.

By conducting three-dimensional simulation of the construction process of the cconstruction projet on the computer before the actual construction; on the one hand, the construction simulation demonstration can vividly express the current construction status and construction methods, which is helpful for on-site technicians to grasp the entire process; On the other hand, problems can be discovered in advanced during the simulation process and construction methods can be adjusted in adavance. Optimizing construction plans through construction simulation can help improve construction quality and communication efficiency, and reduce construction rework.
Prefabricated Cooling Station
Prefabricated Cooling Station
 
Sectional View of Prefabricated Cooling Station
Sectional View of Prefabricated Cooling Station
 
Skid Interior Side View
Skid Interior Side View
 
Cold Machine Plate Replacement Skid
Cold Machine Plate Replacement Skid
 
Cooling Pump System
Cooling Pump System
 

Cutting and Blanking

Cutting and Blanking   Cutting and Blanking   Cutting and Blanking
 

Pipe Accessories Assembly

Pipe Accessories Assembly   Pipe Accessories Assembly   Pipe Accessories Assembly
 

Automatic Welding

Automatic Welding   Automatic Welding   Automatic Welding
 

Quality Inspection

Quality Inspection   Quality Inspection   Quality Inspection

Factory Prefabricated Production

Factory Prefabricated Production   Factory Prefabricated Production   Factory Prefabricated Production
 
Factory Prefabricated Production   Factory Prefabricated Production   Factory Prefabricated Production

On-site Assembly Construction

On-site Assembly Construction   On-site Assembly Construction   On-site Assembly Construction
 
On-site Assembly Construction   On-site Assembly Construction   On-site Assembly Construction

MEP Services

Electrical System

Termination Kit Installer
Termination Kit Installer
 
Installation of Cable Support System
Installation of Cable Support System
 
Installation of Data Hall's Equipment
Installation of Data Hall's Equipment
 

HVAC System

Copper Pipe Welding, Installation
Copper Pipe Welding, Installation
 
Precision Air Conditioning Equipment Display
Precision Air Conditioning Equipment Display
 
Cooling Tower Equipment Display
Cooling Tower Equipment Display
 

Fire Protection System

Sprinkler Main Pipe Installation
Sprinkler Main Pipe Installation
 
Fire Pumpset Installation
Fire Pumpset Installation
 
Dry Riser System Installation
Dry Riser System Installation
 

ELV System

BMS System Installation
BMS System Installation
 
Vehicle Barrier Installation
Anti-collision Door System Installation
 
Security System Installation
Security System Installation

Civil and Structural

Civil and Structural   Civil and Structural   Civil and Structural
 
Civil and Structural

Steel Structural

Steel Structural Platform Installation
Steel Structural Platform Installation

Architecture

Raised Floor & Ceiling Installation
Raised Floor & Ceiling Installation

Interior Design

Lobby Area
Lobby Area
 
Pantry Area
Pantry Area
 
Office Area
Office Area